Were are still advencing. The work is long and chalenging. We are very close to move in on the first […]
Latest Posts
The 2nd Floor in the Tower
The Tower of the Castel During these last months of the year 2022, we have been working in many places […]
Renovation of the terrasse
Renovation of the terrasse One of our old ideas was to build a bay window on two levels. Instead, we […]
What have you done in 2021
What have we done in 2021 Struggling to put all thoses beautiful photos online, Paul has cooked up a little […]
Summer in the castel
Summer in the castel de la gervanne Summer 21 was a summer of love. At the end of June we […]
A Marathon of renovations
42,195 km of renovations Ground floor Démolition en cours ; demolition of course Au rez de chaussée nous cassons un […]
And so it begins….
And so it begins… Lwith as little as 5 month delay, we have finally taken the hammer and started to […]
First floor Studio
This studio is my Castel- First Floor Up the stairs you go and to your left side is the future […]
My home is this Castel- Ground Floor
My home is this Castel- Ground floor Construction is starting this month, after we finalized our planning. Do you want […]
Protecting heritage
Who is protecting our heritage? We live in a village that is about 500 years old, and as such it […]